Installation of tunnel monitoring equipment along South Molton Lane

Prior to the arrival of Crossrail’s Tunnel Boring Machines (TBMs) in Spring 2013, it is necessary to install shallow datum monitoring equipment close to the tunnel alignment to measure possible settlement in the different depths as it passes beneath the South Molton Lane. The equipment will also be used to monitor any changes that may occur to the various utilities within the street.

Please see the information sheet below for further information about the work.
 